
Installation location and position
Choosing the loc-
ation of the in-
verter
Please note the following criteria when choosing a location for the inverter:
Only install on a solid, non-flammable
surface.
Max. ambient temperatures:
-25 °C – +60 °C
Relative humidity:
0-100%
If the inverter is installed in a switch cab-
inet or similar enclosed space, ensure
sufficient heat dissipation with forced-air
ventilation.
For detailed information on the dimen-
sions of the inverter, see chapter
on page
When installing the inverter on the outer walls of cattle sheds, it is important to keep a
minimum clearance of 2 m between all sides of the inverter and air vents and building
openings.
The following surfaces are permissible for installation:
-
Walls (corrugated metal walls [mounting rails], brick walls, concrete walls, or oth-
er non-flammable surfaces sufficiently capable of bearing loads)
-
Poles (installed using mounting rails, behind the solar modules directly on the PV
mounting system)
-
Flat roofs (if this is for a film roof, make sure that the films comply with the fire
protection requirements and are not highly flammable. Ensure compliance with
the national provisions.)
-
Covered car park roofs (no overhead installation)
The inverter is suitable for indoor installation.
The inverter is suitable for outdoor installation.
Because of its IP 66 protection class, the inverter is resistant to water
jets from any direction and can also be used in damp environments.
In order to minimise the heating up of the inverter, do not expose it to
direct insolation. The inverter should be installed in a protected loca-
tion, for example, near the solar modules or under an overhanging
roof.
39
EN
Содержание Symo GEN24 3.0
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Installation 35...
Страница 36: ...36...
Страница 77: ...Settings website of the inverter 77...
Страница 78: ...78...
Страница 104: ...104...
Страница 105: ...Options 105...
Страница 106: ...106...
Страница 115: ...2 Set the DC disconnector to the On switch position Switch on the automatic circuit breaker 115 EN...
Страница 116: ...116...
Страница 117: ...Appendix 117...
Страница 118: ...118...
Страница 132: ...132...
Страница 133: ...Circuit diagrams 133...
Страница 134: ...134...
Страница 135: ...Circuit Diagram PV Point OP Circuit Diagram 135 EN...
Страница 136: ...Fronius Symo GEN24 and BYD Battery Box Premi um HV Circuit Diagram 136...
Страница 137: ...Wiring diagram surge protective device SPD Circuit Diagram 137 EN...
Страница 138: ...138...
Страница 139: ...Dimensions of the inverter 139...
Страница 140: ...140...
Страница 141: ...Fronius Symo GEN24 3 5 kW Fronius Symo GEN24 3 5 kW 141 EN...
Страница 142: ...142...
Страница 143: ...143 EN...
Страница 144: ......