
32
- 11 = 21 → Production year 2021
07
= Calendar week 07
Symbols on the rating plate:
CE mark – confirms compliance with applicable EU directives and regulations.
UKCA mark – confirms compliance with applicable UK directives and
regulations.
WEEE mark – waste electrical and electronic equipment must be collected
separately and recycled in an environmentally sound manner in accordance
with the European Directive and national law.
RCM mark – tested in accordance with the requirements of Australia and New
Zealand.
ICASA mark – tested in accordance with the requirements of the Independent
Communications Authority of South Africa.
CMIM mark – tested in accordance with IMANOR requirements for import
regulations and compliance with Moroccan standards.
Safety symbols:
Risk of serious injury and property damage due to incorrect operation.
Do not use the functions described here until you have fully read and under-
stood the following documents:
-
These Operating Instructions.
-
All Operating Instructions for the system components of the photovoltaic
system, especially the safety rules.
Dangerous electrical voltage.
Allow the capacitors of the inverter to discharge (2 minutes).
Warning notice text:
WARNING!
An electric shock can be fatal. Before opening the device, it must be disconnected and
de-energized at the input and output.
38
Содержание Symo GEN24 3.0
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Installation 35...
Страница 36: ...36...
Страница 77: ...Settings website of the inverter 77...
Страница 78: ...78...
Страница 104: ...104...
Страница 105: ...Options 105...
Страница 106: ...106...
Страница 115: ...2 Set the DC disconnector to the On switch position Switch on the automatic circuit breaker 115 EN...
Страница 116: ...116...
Страница 117: ...Appendix 117...
Страница 118: ...118...
Страница 132: ...132...
Страница 133: ...Circuit diagrams 133...
Страница 134: ...134...
Страница 135: ...Circuit Diagram PV Point OP Circuit Diagram 135 EN...
Страница 136: ...Fronius Symo GEN24 and BYD Battery Box Premi um HV Circuit Diagram 136...
Страница 137: ...Wiring diagram surge protective device SPD Circuit Diagram 137 EN...
Страница 138: ...138...
Страница 139: ...Dimensions of the inverter 139...
Страница 140: ...140...
Страница 141: ...Fronius Symo GEN24 3 5 kW Fronius Symo GEN24 3 5 kW 141 EN...
Страница 142: ...142...
Страница 143: ...143 EN...
Страница 144: ......