Installing the
WSD (wired shut-
down)
IMPORTANT!
The push-in WSD terminal in the inverter's
connection area is delivered with a bypass
ex works as standard. The bypass must
be removed when installing a trigger
device or a WSD chain.
The WSD switch of the first inverter with connected trigger device in the WSD chain must
be in position 1 (primary device). The WSD switch of all other inverters should be in the 0
(secondary device) position.
Max. distance between two devices: 100 m
Max. number of devices: 28
* Floating contact of the trigger device (e.g. central grid and system protection). If several
floating contacts are used in a WSD chain, they must be connected in series.
71
EN
Содержание Symo GEN24 3.0
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Installation 35...
Страница 36: ...36...
Страница 77: ...Settings website of the inverter 77...
Страница 78: ...78...
Страница 104: ...104...
Страница 105: ...Options 105...
Страница 106: ...106...
Страница 115: ...2 Set the DC disconnector to the On switch position Switch on the automatic circuit breaker 115 EN...
Страница 116: ...116...
Страница 117: ...Appendix 117...
Страница 118: ...118...
Страница 132: ...132...
Страница 133: ...Circuit diagrams 133...
Страница 134: ...134...
Страница 135: ...Circuit Diagram PV Point OP Circuit Diagram 135 EN...
Страница 136: ...Fronius Symo GEN24 and BYD Battery Box Premi um HV Circuit Diagram 136...
Страница 137: ...Wiring diagram surge protective device SPD Circuit Diagram 137 EN...
Страница 138: ...138...
Страница 139: ...Dimensions of the inverter 139...
Страница 140: ...140...
Страница 141: ...Fronius Symo GEN24 3 5 kW Fronius Symo GEN24 3 5 kW 141 EN...
Страница 142: ...142...
Страница 143: ...143 EN...
Страница 144: ......