5 System Operations
14
Fig 5-2
CEMS-2000s Monitoring Software Screen
5.2
Preparation of Running System
5.2.1
Pre-Checking
Normally the following items should be checked before the system is powered on:
1.)
The system should be grounded properly;
2.)
Meter pressure (0.4 MPa – 0.6MPa) should be prepared and connected;
3.)
The optical fiber should be firmly connected and its bend radius should be more than
8cm;
4.)
The gas exhaust should be inducted with a pipe to outdoor.
5.2.2
Power-Up Sequence
The power switches of the system are installed at the front panel of CEMS-2000s cabinet. Fig
5-3 is part of the switches. When you switch on the power, please switch on the main switch first
and then switch on other switches in sequence.
Содержание CEMS-2000 Series
Страница 13: ...CONTENT OF FIGURES XII FOCUSED PHOTONICS INC Fig 5 80 Layout of Main Window 107...
Страница 56: ...6 Operations of OMA 2000 Spectroscopic Gas Analyzer 34 FOCUSED PHOTONICS INC Fig 6 8 Menu Structure...
Страница 78: ...6 Operations of OMA 2000 Spectroscopic Gas Analyzer 56 FOCUSED PHOTONICS INC Fig 6 42 Unit Setup...