instrument panel, to pull the cables up and prevent sag towards the
battery.
5.5.4 Rubbing cables
a) Check both the rudder and elevator cables to make sure they are not rubbing
on any tubes.
Apply some typical tension to the cables, such as feet against the
rudder pedals, as this will give a better indication of any problem areas.
b) Fine adjustments to the pulley positions can be made. The pulleys may have
to be carefully shimmed with thin washers between the starboard central cabin
tube
tu19
and the first pulley plate to ensure that the rudder cable just avoids
rubbing on the tube where it runs from the pedal to the pulley, figure 115.
The cable should not quite touch the tube with weight on the rudder
pedals. If it is too close for comfort a piece of prop tape can be placed
on the tube to act as a fairlead. If it touches the starboard central cabin
brace piece this may be shimmed out with plastic washers between it
and the
tu19
tube, up to 3mm if necessary. This limit is due to the
elevator cable rubbing the central brace at full left aileron.
Any shimming of the pulleys must not be over-done or the elevator
cable on the lower end of the stick will rub on the central cabin brace,
attached to the port central cabin tube
tu19
, on full right aileron. Wait
until the aileron movements are set up later before worrying too much,
you may have to adjust the stops to reduce the movement to the
correct amount.
Adjustment of the cables and the pulleys will require some fiddling to
achieve nice clean cable runs which do not rub, so don‟t tighten the
bolts up until this is achieved.
Figure 115 starboard rudder cable routing past central braces.
Содержание Nynja Build
Страница 1: ...1 Nynja Build manual Version 1 0...
Страница 2: ...2 Figure 1 tube numbering scheme...
Страница 3: ...3 Figure 2 Basic frame Skyranger...
Страница 4: ...4 Figure 3 uncovered Skyranger frame...
Страница 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Страница 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Страница 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Figures 65 cable arrangement further overview...
Страница 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Страница 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 117: ...117 Figure 141 front and rear of tensioning tube File edge of this saddle washer 2 3mm to clear U bracket on fuselage...
Страница 118: ...118 Figure 142 tensioning tube fittings front in left photo note bolt through compression tube rear in right photo...
Страница 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Страница 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Страница 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Страница 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Страница 255: ...255 Nynja Build manual 1 0 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 256: ...256 Nynja Build manual 1 0...
Страница 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Страница 258: ...258 Nynja Build manual 1 0...
Страница 259: ...259 Nynja Build manual 1 0...
Страница 260: ...260 Nynja Build manual 1 0...
Страница 265: ...265 Nynja Build manual 1 0...