10
Introduction
1.1 How to Build Your Aircraft
Building the Nynja is a fairly straightforward process, but it can be made much more
difficult than necessary if one basic rule is not followed:
READ THE INSTRUCTIONS!
Figure 8 A rare sight, but essential for successful building (the manual that is, not Rob)!
The Build Manual
Reading the whole manual before starting is suggested. Reading ahead by at least
the section being worked upon, as each section is reached, is recommended.
Reading the instructions for the components under your spanners is essential! It is
remarkable how often the instructions are over-looked or misread, remembering that
you are going to fly in your finished aircraft!
Instructions, however, are never as good as they could be, and so corrections and
suggestions for improving the instructions are welcome, preferably in writing by
email. These can then be included in future updates of the manuals.
If you have errata or receive updates to the manual, mark these immediately in
your copy of the manual so that you do not forget them when you reach that
stage.
An electronic copy of the build manual is included on the CD in Adobe PDF format,
along with the reader software needed. This can be used to print off replacement
pages, to zoom in on photographs, and to print colour versions of the wiring
diagrams. Updates to the manual will be made available either on CD or via the
Flylight website (
www.flylight.co.uk
).
Don‟t rush things, work carefully, and don‟t forget to enjoy building your aeroplane!
Содержание Nynja Build
Страница 1: ...1 Nynja Build manual Version 1 0...
Страница 2: ...2 Figure 1 tube numbering scheme...
Страница 3: ...3 Figure 2 Basic frame Skyranger...
Страница 4: ...4 Figure 3 uncovered Skyranger frame...
Страница 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Страница 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Страница 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Figures 65 cable arrangement further overview...
Страница 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Страница 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 117: ...117 Figure 141 front and rear of tensioning tube File edge of this saddle washer 2 3mm to clear U bracket on fuselage...
Страница 118: ...118 Figure 142 tensioning tube fittings front in left photo note bolt through compression tube rear in right photo...
Страница 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Страница 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Страница 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Страница 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Страница 255: ...255 Nynja Build manual 1 0 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 256: ...256 Nynja Build manual 1 0...
Страница 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Страница 258: ...258 Nynja Build manual 1 0...
Страница 259: ...259 Nynja Build manual 1 0...
Страница 260: ...260 Nynja Build manual 1 0...
Страница 265: ...265 Nynja Build manual 1 0...