12
1.2 The BMAA Homebuilt Aircraft System
Before starting the build of your Nynja you must register the project with the BMAA.
The required forms are downloadable from the BMAA website at
www.bmaa.org
, go
to the Technical Information section, click on Forms, and download form
BMAA/AW/022.
An example form for a Nynja fitted with a Rotax 912ULS and standard Kiev prop 283
is shown towards the end of this manual.
You will have to find a BMAA Inspector to oversee the project. A list of Inspectors is
available from the BMAA if required. Fill in the form with information about your
aircraft and Inspector.
Send this form, along with the certificate of conformance for the aircraft, engine and
propeller, with the current fee to the BMAA.
The BMAA will then register the project and issue you with a project number. They
will send you a pack of paperwork with information about building a BMAA homebuilt,
and a stage inspection form to be completed during the build by yourself and your
Inspector.
Please read all the paperwork that the BMAA send you when you receive it
–
this may prevent stress later!
You can also register the aircraft with the CAA and order registration letters
(available from Flylight) to save time later.
Your Inspector is required to visit prior to commencing any real building to inspect
your workshop and the kit. This forms the first stage inspection.
Your Inspector has to sign off several key stages of the build. Get his signature on
the form at the time, just in case! He can be a very useful source of knowledge and
advice, and should be your „mentor‟ during the build. Also, a second pair of eyes and
an experienced mind can often solve problems for you in an instant.
Inspectors will vary somewhat in their likes and dislikes, and so requirements may
vary from what you may consider to be adequate. It is best to listen to your
inspector‟s views, but in case of specific queries either you or your inspector may
contact Flylight or the BMAA directly to discuss matters.
Please respect the stage inspections and do not present him with a fully built aircraft
for the first visit! It is not his fault if you have to undo a lot of building to make right
something that should have been checked in a stage inspection before continuing
further. If there is a delay in having an inspection it is better to get on with building
bits and pieces like wheels and wing frames than to continue adding to the main
assemblies.
When your aircraft is complete and to your Inspector‟s satisfaction, the completed
stage inspection form is sent to the BMAA. Also required to be sent at the same time
is the Engine Installation Check Sheet (either the Rotax version or the generic BMAA
version for non-Rotax engines). This details tests required to ensure correct
installation and set up of the engine, such as the fuel-flow test described towards the
end of this manual. Again your inspector has to witness the tests and sign the form.
The BMAA will then process the paperwork and raise a BMAA AW029 giving
permission to test fly, along with a draft MAAN (Microlight Aircraft Approval Note) for
Содержание Nynja Build
Страница 1: ...1 Nynja Build manual Version 1 0...
Страница 2: ...2 Figure 1 tube numbering scheme...
Страница 3: ...3 Figure 2 Basic frame Skyranger...
Страница 4: ...4 Figure 3 uncovered Skyranger frame...
Страница 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Страница 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Страница 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Figures 65 cable arrangement further overview...
Страница 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Страница 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 117: ...117 Figure 141 front and rear of tensioning tube File edge of this saddle washer 2 3mm to clear U bracket on fuselage...
Страница 118: ...118 Figure 142 tensioning tube fittings front in left photo note bolt through compression tube rear in right photo...
Страница 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Страница 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Страница 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Страница 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Страница 255: ...255 Nynja Build manual 1 0 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 256: ...256 Nynja Build manual 1 0...
Страница 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Страница 258: ...258 Nynja Build manual 1 0...
Страница 259: ...259 Nynja Build manual 1 0...
Страница 260: ...260 Nynja Build manual 1 0...
Страница 265: ...265 Nynja Build manual 1 0...