15
Loctite should be used very sparingly. A common mistake is to overuse it. Loctite
smeared over the outside of fasteners acts as a corrosive agent. Any surplus should
be immediately removed with a soft cloth.
A good tip is to paint a red stripe across the nut and bolt end after final tightening.
This way it will be easy to inspect and spot any nuts not finally tightened.
Main tools needed for assembly
Spanners and sockets in the range of: 6, 8, 10, 12, 13, 14, 17mm
Allen keys: 4, 6, 8mm
Metal saw
Drill and bits for metal
Rivet pliers
Cutting pliers
General pliers
Screwdrivers, flat and cross-head
Hammers, metal and rubber/plastic
Mouse tail file with diameter less than 6mm
Flat file
Engineers Rule
Tape measure
6mm reamer (desirable)
Wire-locking pliers (desirable)
Cleco‟s or Skin pins for 4mm holes
Dremel Multi tool or equivalent small cutting / sanding tool
Soft faced clamps
Products needed for assembly
Loctite 243, to be used on all bolts
Silicon grease
Oil for general use
Oil for engine and gearbox, see engine documents
Epoxy adhesive (Araldite or similar)
Lock-wire
Holes
All the holes have been drilled to a high accuracy, however it may sometimes be
necessary to use a round file or reamer to ease the insertion of some bolts. Be
careful not to make a hole too large however, sometimes all that is required is to
loosen other bolts nearby, or to apply pressure to some other part. Generally bolts
should not be tightened up until all the parts in a particular sub-assembly are
assembled, to avoid the common problem of the final bolt not fitting!
Washers
Metal washers should be used to prevent scratching of the surface as a nut is
tightened.
Nylon washers, or similar plastic washers, should be used to:
a) fill spaces between parts, such as between tubes and U-brackets
Содержание Nynja Build
Страница 1: ...1 Nynja Build manual Version 1 0...
Страница 2: ...2 Figure 1 tube numbering scheme...
Страница 3: ...3 Figure 2 Basic frame Skyranger...
Страница 4: ...4 Figure 3 uncovered Skyranger frame...
Страница 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Страница 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Страница 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Figures 65 cable arrangement further overview...
Страница 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Страница 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 117: ...117 Figure 141 front and rear of tensioning tube File edge of this saddle washer 2 3mm to clear U bracket on fuselage...
Страница 118: ...118 Figure 142 tensioning tube fittings front in left photo note bolt through compression tube rear in right photo...
Страница 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Страница 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Страница 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Страница 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Страница 255: ...255 Nynja Build manual 1 0 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 256: ...256 Nynja Build manual 1 0...
Страница 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Страница 258: ...258 Nynja Build manual 1 0...
Страница 259: ...259 Nynja Build manual 1 0...
Страница 260: ...260 Nynja Build manual 1 0...
Страница 265: ...265 Nynja Build manual 1 0...