![Flylight Nynja Build Скачать руководство пользователя страница 84](http://html1.mh-extra.com/html/flylight/nynja-build/nynja-build_manual_2311646084.webp)
84
Figure 97 vertical and horizontal stabiliser front mounting.
d) Attach the lower and upper cables to the back edge of the horizontal
stabilisers at the outer eyebolt, Figure .
The upper cables should go on first, against the tailplane trailing edge
tube.
The turnbuckles should be at the inboard, lower ends of the lower
cables, where they can be attached to the tangs already fitted to the
lower rudder eyebolt. Tighten evenly by hand. The eyebolts along the
trailing edge of the tailplane halves should all line up when sighted
through.
Make sure the inner eyebolt on the horizontal stabilizer has a saddle
washer and one plastic spacer behind it, to match the spacing of the
outer eyebolts where the bracing cable tangs attach. There are no
saddle washers used on the outer eyebolts.
The trick of using either sticky tape or blue-tack to hold washers and
nuts to spanners is worth remembering here.
5.3.2 Elevators
a) Put the port elevator into place and secure with a pivot-pin through each
eyebolt.
As the elevator is likely to be removed for transportation etc., the pivot-
pins should not be split-pinned at this stage.
b) Slide the joiner into place onto the port elevator and then fit the starboard
elevator.
c) Make sure that the joiner is fully pressed back onto the elevator tubes and fits
snugly.
Содержание Nynja Build
Страница 1: ...1 Nynja Build manual Version 1 0...
Страница 2: ...2 Figure 1 tube numbering scheme...
Страница 3: ...3 Figure 2 Basic frame Skyranger...
Страница 4: ...4 Figure 3 uncovered Skyranger frame...
Страница 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Страница 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Страница 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Figures 65 cable arrangement further overview...
Страница 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Страница 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 117: ...117 Figure 141 front and rear of tensioning tube File edge of this saddle washer 2 3mm to clear U bracket on fuselage...
Страница 118: ...118 Figure 142 tensioning tube fittings front in left photo note bolt through compression tube rear in right photo...
Страница 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Страница 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Страница 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Страница 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Страница 255: ...255 Nynja Build manual 1 0 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 256: ...256 Nynja Build manual 1 0...
Страница 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Страница 258: ...258 Nynja Build manual 1 0...
Страница 259: ...259 Nynja Build manual 1 0...
Страница 260: ...260 Nynja Build manual 1 0...
Страница 265: ...265 Nynja Build manual 1 0...