107
i) Push the rubber mounts firmly into their holes in the engine mounts. On the
upper plates position them so the male halves are fitted from outside to inside
– this makes changing them in situ much easier later in the life of the aircraft.
7.2
Mounting
a) Position the engine on the Nynja making sure you do not bump the CDI
pickups located on top of the flywheel.
Figure 126 engine mounts.
Support the engine on a bench, such as a workmate, chock it up to the
correct height, and offer the fuselage up to it. An engine hoist (which
can be hired from your local hire shop), or some other method of lifting
the engine may be used as an alternative.
Be careful how you support the engine, do not let its weight bear on any
of its many ancillary parts such as the spark plugs, filters etc.
Warning: do not let the engine tip forwards whilst connecting the
upper engine mounts to the mounting plates as damage will occur
to the rear of the engine.
b) Fix the upper starboard rubber engine mount between the two penny washers
with the long 140mm bolt.
Содержание Nynja Build
Страница 1: ...1 Nynja Build manual Version 1 0...
Страница 2: ...2 Figure 1 tube numbering scheme...
Страница 3: ...3 Figure 2 Basic frame Skyranger...
Страница 4: ...4 Figure 3 uncovered Skyranger frame...
Страница 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Страница 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Страница 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Figures 65 cable arrangement further overview...
Страница 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Страница 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 117: ...117 Figure 141 front and rear of tensioning tube File edge of this saddle washer 2 3mm to clear U bracket on fuselage...
Страница 118: ...118 Figure 142 tensioning tube fittings front in left photo note bolt through compression tube rear in right photo...
Страница 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Страница 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Страница 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Страница 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Страница 255: ...255 Nynja Build manual 1 0 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 256: ...256 Nynja Build manual 1 0...
Страница 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Страница 258: ...258 Nynja Build manual 1 0...
Страница 259: ...259 Nynja Build manual 1 0...
Страница 260: ...260 Nynja Build manual 1 0...
Страница 265: ...265 Nynja Build manual 1 0...