218
Nynja Build manual 1.0
c) Fit the outer cable in the sockets on the forward and rear cable brackets, and
then periodically cable tie along its length to bits of fuselage structure / bracing
wires so it
won‟t rattle about.
d) To hold the cable end into its thimble on the rear cable bracket on the elevator
leading edge, cover the cable end and the thimble with a piece of heat shrink
tubing over each cable/thimble combination.
Take care not to melt the coverings! Direct the heat away from them,
and check they don‟t get hot.
Figure 277 aft end of trimmer cable.
e) Melt a hole in the upper surface of the elevator fabric for the inner cable,
230mm forwards of the trailing edge and 130mm away from the tapered edge
of the elevator, both distances measured at 90
to the respective edge, Figure
278.
A small tipped soldering iron is good for this job
– push it in at a slight angle
aiming for a hole about 4mm wide and just a little longer.
Figure 278 position of hole in top elevator surface.
f) Also melt a hole in the lower surface of the elevator fabric for the inner cable,
140mm rearwards of the centre of the leading edge and 170mm away from
Содержание Nynja Build
Страница 1: ...1 Nynja Build manual Version 1 0...
Страница 2: ...2 Figure 1 tube numbering scheme...
Страница 3: ...3 Figure 2 Basic frame Skyranger...
Страница 4: ...4 Figure 3 uncovered Skyranger frame...
Страница 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Страница 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Страница 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Figures 65 cable arrangement further overview...
Страница 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Страница 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 117: ...117 Figure 141 front and rear of tensioning tube File edge of this saddle washer 2 3mm to clear U bracket on fuselage...
Страница 118: ...118 Figure 142 tensioning tube fittings front in left photo note bolt through compression tube rear in right photo...
Страница 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Страница 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Страница 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Страница 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Страница 255: ...255 Nynja Build manual 1 0 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 256: ...256 Nynja Build manual 1 0...
Страница 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Страница 258: ...258 Nynja Build manual 1 0...
Страница 259: ...259 Nynja Build manual 1 0...
Страница 260: ...260 Nynja Build manual 1 0...
Страница 265: ...265 Nynja Build manual 1 0...