147
10.
Floor pan, firewall and cowlings
10.1 Floor pan
With the cabin uprights in place we can now fit the glassfibre floor pan panel.
a) Trim to the cut marks to fit around the main undercarriage legs then offer up in
position, after first removing the flap detent lever.
b) Hold up in position using cardboard boxes or similar and clamps on the sides.
Verify correct positioning by reference to the underneath rear edge where it
joins the rear fuselage shells, and the cabin uprights
– see figures below:
Figure 176 rear edge
Figure 177 forward positioning
c) Note in figure 177 above, the joggled edge should be aligned just behind the
rear face of the cabin upright tube. Note also the vertical positioning
– 890mm
blow top of cabin upright tube. The lower rear edge may need some dressing
with a sanding block and 80 grit paper to achieve a nice even fit.
d) Check the rear sides and ensure overlap or alignment with joggled edge of
rear fuselage shells. See Fig 178 below
890mm from top of tube
Содержание Nynja Build
Страница 1: ...1 Nynja Build manual Version 1 0...
Страница 2: ...2 Figure 1 tube numbering scheme...
Страница 3: ...3 Figure 2 Basic frame Skyranger...
Страница 4: ...4 Figure 3 uncovered Skyranger frame...
Страница 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Страница 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Страница 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Figures 65 cable arrangement further overview...
Страница 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Страница 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 117: ...117 Figure 141 front and rear of tensioning tube File edge of this saddle washer 2 3mm to clear U bracket on fuselage...
Страница 118: ...118 Figure 142 tensioning tube fittings front in left photo note bolt through compression tube rear in right photo...
Страница 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Страница 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Страница 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Страница 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Страница 255: ...255 Nynja Build manual 1 0 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 256: ...256 Nynja Build manual 1 0...
Страница 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Страница 258: ...258 Nynja Build manual 1 0...
Страница 259: ...259 Nynja Build manual 1 0...
Страница 260: ...260 Nynja Build manual 1 0...
Страница 265: ...265 Nynja Build manual 1 0...