![Flylight Nynja Build Скачать руководство пользователя страница 106](http://html1.mh-extra.com/html/flylight/nynja-build/nynja-build_manual_2311646106.webp)
106
Figure 124 water pump outlet in correct position
e) Remove the upper rear case bolt located above the starter.
This bolt will be replaced with a 10mm x 140mm Allen head machine
bolt when the engine is fitted.
f) The upper port mounting bolt will not clear the cylinder head fins. The fins
must be trimmed with a file, a small Dremel grinding tool, or similar method.
Don‟t be frightened of this – it will be much easier if you grind off a generous
amount! Remove the inlet manifold to get good clear access
– but protect the
opening to the cylinder heads with tape or similar to prevent swarf getting in!
g) Trial fit the bolt to make sure you have trimmed enough off, including the
rubber mount and washers. Ensure an easy fit, to eliminate any risk of cross-
threading the bolt.
Figure 125 upper port mounting bolt.
h) Drill a small hole for lock-wire in the heads of all four 10mm diameter engine
mounting bolts.
Use a new, good quality bit, drill slowly, and lubricate with 3-in-1 oil.
Содержание Nynja Build
Страница 1: ...1 Nynja Build manual Version 1 0...
Страница 2: ...2 Figure 1 tube numbering scheme...
Страница 3: ...3 Figure 2 Basic frame Skyranger...
Страница 4: ...4 Figure 3 uncovered Skyranger frame...
Страница 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Страница 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Страница 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Figures 65 cable arrangement further overview...
Страница 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Страница 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 117: ...117 Figure 141 front and rear of tensioning tube File edge of this saddle washer 2 3mm to clear U bracket on fuselage...
Страница 118: ...118 Figure 142 tensioning tube fittings front in left photo note bolt through compression tube rear in right photo...
Страница 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Страница 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Страница 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Страница 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Страница 255: ...255 Nynja Build manual 1 0 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 256: ...256 Nynja Build manual 1 0...
Страница 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Страница 258: ...258 Nynja Build manual 1 0...
Страница 259: ...259 Nynja Build manual 1 0...
Страница 260: ...260 Nynja Build manual 1 0...
Страница 265: ...265 Nynja Build manual 1 0...