105
7. Engine Installation
Note that the engine is LIVE until the magneto wires are grounded.
Fig 123 engine installation overview
Rotax 912/912S
7.1
Preparation
a) Find a clean area to work on the engine, and then give it an even better clean:
you do not want any dust or swarf etc. to get into your engine.
b) Read the instructions which came with the engine for details of installation
requirements, and for maintenance and operating procedures.
c) Remove the carburettors and air filters by loosening the screw clamping the
carburettors into the rubber mounts and sliding them out. Cover the exposed
holes with tape or similar.
When reinstalling the carburettors the rubbers should be degreased to
remove any oil, and the clamps tightened as specified in the engine
instructions.
d) The water pump inlet on the bottom rear of the engine must be turned so that
it points at 90 degrees to the starboard side of the engine, see the engine
instructions for the procedure.
Take care not to lose the O-ring seal and note the torque value of
10Nm (1kgm, 7ftlb) for the fixing screws.
Содержание Nynja Build
Страница 1: ...1 Nynja Build manual Version 1 0...
Страница 2: ...2 Figure 1 tube numbering scheme...
Страница 3: ...3 Figure 2 Basic frame Skyranger...
Страница 4: ...4 Figure 3 uncovered Skyranger frame...
Страница 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Страница 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Страница 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Figures 65 cable arrangement further overview...
Страница 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Страница 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 117: ...117 Figure 141 front and rear of tensioning tube File edge of this saddle washer 2 3mm to clear U bracket on fuselage...
Страница 118: ...118 Figure 142 tensioning tube fittings front in left photo note bolt through compression tube rear in right photo...
Страница 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Страница 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Страница 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Страница 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Страница 255: ...255 Nynja Build manual 1 0 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 256: ...256 Nynja Build manual 1 0...
Страница 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Страница 258: ...258 Nynja Build manual 1 0...
Страница 259: ...259 Nynja Build manual 1 0...
Страница 260: ...260 Nynja Build manual 1 0...
Страница 265: ...265 Nynja Build manual 1 0...