![Flylight Nynja Build Скачать руководство пользователя страница 135](http://html1.mh-extra.com/html/flylight/nynja-build/nynja-build_manual_2311646135.webp)
135
y) Tension the fabric to the point that you see the compression tube bowing,
Figure 160.
There should be around a 4cm gap between the compression tube and
the vertical wing tensioning tubes.
This should result in the bow in the compression tube being no more
than the diameter of the compression tube. You can check by placing a
straight edge along the compression tube and measuring the space in
between.
z) Check that the cables in the wing are still taught, tighten if necessary, then
secure the turnbuckle with safety wire.
aa) Use the rope that you have attached to the leading edge of the fabric to pull
the fabric tight in the same manner as before.
Look for the wrinkles just near the leading edge-root section of the
wing. Tension the fabric with the rope until you see these wrinkles pull
out. This will require a good firm pull.
bb) Whilst holding the tension on drill a hole through the centre of the grommet
and secure the fabric in place with a 4mm or larger steel rivet and a washer.
Alternatively a stainless steel countersunk screw can be used.
Remove the string before the final rivet pull or screw turn.
cc) Leave a nut on the end of the threaded tensioning rods and cut off the
remaining thread, then finish nicely with a file.
dd) Measure the distance from the fabric to the end of the leading edge and make
both wings the same, otherwise it will look odd when aligned with the cabin
doors.
A typical measurement is around 44cm.
Содержание Nynja Build
Страница 1: ...1 Nynja Build manual Version 1 0...
Страница 2: ...2 Figure 1 tube numbering scheme...
Страница 3: ...3 Figure 2 Basic frame Skyranger...
Страница 4: ...4 Figure 3 uncovered Skyranger frame...
Страница 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Страница 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Страница 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Страница 60: ...60 Figures 65 cable arrangement further overview...
Страница 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Страница 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Страница 117: ...117 Figure 141 front and rear of tensioning tube File edge of this saddle washer 2 3mm to clear U bracket on fuselage...
Страница 118: ...118 Figure 142 tensioning tube fittings front in left photo note bolt through compression tube rear in right photo...
Страница 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Страница 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Страница 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Страница 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Страница 255: ...255 Nynja Build manual 1 0 27 Additional Information 27 1 Example BMAA Homebuilt Registration Form...
Страница 256: ...256 Nynja Build manual 1 0...
Страница 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Страница 258: ...258 Nynja Build manual 1 0...
Страница 259: ...259 Nynja Build manual 1 0...
Страница 260: ...260 Nynja Build manual 1 0...
Страница 265: ...265 Nynja Build manual 1 0...