![FLIGHT DESIGN CTLS Series Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/flight-design/ctls-series/ctls-series_maintenance-and-inspection-procedures-manual_2305270043.webp)
Maintenance and Inspection Procedures Manual
Type:
CT
Series:
CTLS
LSA
Page: 4-6
AF 04800001
Revision No. 3
Date: 14 Sep 2008
11) Match the hole of the spar bushing of the right wing KA2010102 with the hole of the bushing of
the left wing KA2010103 from the right side moving the wing up and down (Fig. 9).
Fig. 11
12) Push the main bolts fully in, e.g. set the main bolt KA2000010 (1) into the matched holes of the
bushings KA2010102 and KA2010103 by moving the wing up and down (Fig. 11 and 12).
Fig. 12