8.2.4.9 Check list to be filled prior the access to the inverter
The purpose of checklist is to verify that all the operations mentioned in the procedure have been carried out. The checklist below must
be attached to the intervention report.
Check
STATUS (√ or X)
Prepare for the work and identify the work location and equipment
PPE and Equipment Check
PPE wearing
OPERATIONS AT PLANT LEVEL
(1)
Check the absence of dangerous voltages on inverter chassis respect ground
Operations in External AC switch
Operations in External DC Switch (If present)
OPERATIONS AT INVERTER LEVEL
Operations on internal AC switch (if present)
Operations on internal DC switches
Wait the discharge of the internal capacitor
ISSUE WORK PERMIT
Issue work permit and “Walk the permit” – Check list filling
ONLY if all checks are POSITIVE (√) the ACCESS IS ALLOWED
1. Identification of the external switch may require the cooperation of the plant manager and it must be included in the switching plan
defined during the preparation of the work.
Содержание FMR-PVS-10-TL-SX
Страница 1: ...Solar Inverter PVS 10 12 5 15 TL Product Manual ...
Страница 15: ...EN 15 3 4 1 Inverter external view 02 07 05 01 03 04 26 09 23 08 20 21 ...
Страница 16: ...EN 16 08 05 19 19 09 16 18 18 25 15 14 17 13 12 10 11 ...
Страница 79: ...EN 79 ...