EN
43
crimping cables to the connectors, pay particular attention
to polarity.
ATTENTION –
A
According to IEC 62548 (Photovoltaic (PV)
arrays – Design requirements), connectors mated together
in a PV system shall be of the same type from the same
manufacturer, i.e. a plug from one manufacturer and a socket
from another manufacturer or vice versa shall not be used
to make a connection. Refer to document “String inverters
- Product manual appendix” available on the website to find
out the manufacturer and model of quick fit connector used
on the inverter.
ATTENTION –
A
Using counterparts that are not compliant
with the quick fit connector models on the inverter could
cause serious damage to the unit and lead to invalidation of
the warranty.
NOTE –
D
Complete assembly instructions and specification
of quick-fit connectors could be found on manufacturer
website.
Input cables must meet the connector requirements and depends
from connector models (see “3.5.3 Cable gland clamping range”
and “3.5.4 Connectors cross section range”).
• Strip the cable over a lenght of 6,0 to 7,5mm using suitable
equipment.
• Crimp the terminal to the conductor using the designated pliers.
6.0...7.5mm
*4...10mm
*4.7...8.4mm
2
(*): depends on
connector models
• Insert the crimped terminal contact into the insulator body of the
connector, until you hear the click indicating that the terminal is
engaged inside the connector.
Click
• Firmly tighten the cable gland using the relevant tool to finish the
operation (see “3.5.2 Tightening torques”).
5.5.1.2 Connection of inputs
Connect all the strings required by the system by pushing the quick
fit connectors in the right position.
Click
Click
ATTENTION –
A
Check that protective caps are installed on
unused connectors. This is necessary for the inverter seal
and to avoid any damage to the unused connectors which
may be used at a later time.
ATTENTION –
A
The quick fit connectors must be properly
installed. After the installation make sure the connectors are
correctly locked through the clips.
NOTE –
D
Notes on the system sizing - Decisions on how
to structure a photovoltaic system depend on a series of
factors and considerations, such as the type of panels, the
space availability, the future location of the system, energy
production goals over the long term, etc. A configuration
program that can help to correctly size the photovoltaic
system is available on the FIMER website (
).
Содержание FMR-PVS-10-TL-SX
Страница 1: ...Solar Inverter PVS 10 12 5 15 TL Product Manual ...
Страница 15: ...EN 15 3 4 1 Inverter external view 02 07 05 01 03 04 26 09 23 08 20 21 ...
Страница 16: ...EN 16 08 05 19 19 09 16 18 18 25 15 14 17 13 12 10 11 ...
Страница 79: ...EN 79 ...