EN
57
7.2.3.2 STEP 2 - Date, Time and Time zone.
• Set the Date, Time and Time zone
The inverter will automatically fill these fields when available;
when it’s not possible for the inverter to detect the time protocol,
these fields have to be manually entered.
• Click on “Next” button to continue the configuration wizard.
7.2.3.3 STEP 3 - Inverter configuration
• Country standard (selection of grid standard):
Set the grid standard of the country in which the inverter is
installed.
• Click on “Next” button to complete the configuration wizard.
ATTENTION –
A
At the end of the configuration wizard the
inverter will reboot to be configured.
• A notification will confirm that the wizard is completed.
• Depending of the supply source used to complete the installation
wizard steps, close the disconnect switch of any missing voltage
sources.
• If the input voltage is sufficient to allow the connection to the grid,
the inverter will perform preliminary checks of the AC and DC
parameters and performs other auto-diagnostic checks.
• If the outcome of the preliminary checks to grid synchronization
are positive, the inverter connects to the grid and starts to export
power.
NOTE –
D
To address any problems that may occur during the
initial stages of operation of the system and to ensure the
inverter remains fully functional, you are advised to check for
any firmware updates in the dedicated section of web user
interface (“SERVICE TOOLS” menu) or via Installer for Solar
Inverters mobile APP.
Содержание FMR-PVS-10-TL-SX
Страница 1: ...Solar Inverter PVS 10 12 5 15 TL Product Manual ...
Страница 15: ...EN 15 3 4 1 Inverter external view 02 07 05 01 03 04 26 09 23 08 20 21 ...
Страница 16: ...EN 16 08 05 19 19 09 16 18 18 25 15 14 17 13 12 10 11 ...
Страница 79: ...EN 79 ...