4. I/O module extensions of the CHB−C−P/..X
4−8
Festo P.BE−CB−COMP−en en 0503c
Special functions of the PLC interface
1)
Pin
Fault messages
Fault status 0: Warning
O/23
Monitoring the buffer zones and controlling the parts supply
with switch hysteresis.
Buffer zone sensor 2
2)
I/13
Additional test of material features which are not checked
during contour registering (e.g. by metal detector or colour
sensor). Downstream−switched test function, i.e. only good
parts are checked.
External sensor
3) 4)
I/10
Externally−controlled switching on/off the picture registering
under particularly difficiult conditions.
Camera trigger
I/9
E.g. for monitoring the pneumatic supply for the actuators: In
the event of a fault, the CHB−C−P/..X will be switched to fault
status E01 by means of a pressure switch.
External fault
I/19
1)
Deactivated at the factory Functions can be activated and adapted with CheckKon.
2)
Only type CHB−C−X. can be set optionally with CheckKon, set at factory External type selection:
bit 2".
3)
Counting function and special function External sensor" cannot be used at the same time.
4)
Only type CHB−C−X: can be set optionally with CheckKon, set at factory External type selection:
bit 3".
Tab.4/4: Special functions of the PLC interface
Electrical properties of the PLC interface
Inputs
Input current:
< 30 mA
Logical 1": V
on
> 15 V
Logical 0": V
on
< 5 V
Outputs
Max. current loading per channel:
700 mA
Max. sum current of all outputs:
1 A
PNP switching
1
3
7
4
8
12
13
16
21
17
22
24
Tab.4/5: Electrical properties of the PLC interface
Содержание Checkbox Compact CHB-C-X
Страница 1: ...Manual Checkbox Compact Type CHB C Manual 533 412 en 0503c 693 849 Checkbox Compact...
Страница 2: ...Festo Checkbox is a registred trademark of Festo AG Co KG D 73726 Esslingen Germany...
Страница 4: ...Contents and general instructions II Festo P BE CB COMP en en 0503c...
Страница 8: ...Contents and general instructions VI Festo P BE CB COMP en en 0503c...
Страница 18: ...Contents and general instructions XVI Festo P BE CB COMP en en 0503c...
Страница 19: ...System summary 1 1 Festo P BE CB COMP en en 0503c Chapter 1...
Страница 30: ...1 System summary 1 12 Festo P BE CB COMP en en 0503c...
Страница 31: ...Fitting and commissioning 2 1 Festo P BE CB COMP en en 0503c Chapter 2...
Страница 52: ...2 Fitting and commissioning 2 22 Festo P BE CB COMP en en 0503c...
Страница 53: ...The I O module 3 1 Festo P BE CB COMP en en 0503c Chapter 3...
Страница 64: ...3 The I O module 3 12 Festo P BE CB COMP en en 0503c...
Страница 65: ...I O module extensions of the CHB C P X 4 1 Festo P BE CB COMP en en 0503c Chapter 4...
Страница 89: ...Teaching parts 5 1 Festo P BE CB COMP en en 0503c Chapter 5...
Страница 99: ...Testing parts 6 1 Festo P BE CB COMP en en 0503c Chapter 6...
Страница 109: ...Maintenance 7 1 Festo P BE CB COMP en en 0503c Chapter 7...
Страница 110: ...7 Maintenance 7 2 Festo P BE CB COMP en en 0503c Contents 7 Maintenance 7 1...
Страница 113: ...Technical appendix A 1 Festo P BE CB COMP en en 0503c Appendix A...
Страница 140: ...A Technical appendix A 28 Festo P BE CB COMP en en 0503c...
Страница 141: ...Index B 1 Festo P BE CB COMP en en 0503c Appendix B...
Страница 142: ...B Index B 2 Festo P BE CB COMP en en 0503c Contents B Index B 1 B 1 Index B 3...