
[email protected]
whatsapp:959440045
6
Dismantling & Assembly
6.1
Inlet/outlet and bowl
5.
Fit the upper distributing ring so that drill mark
(a) is in line with hole (c) on the distributing ring.
When the distributing ring is in correct position
the guide pin (b) will enter hole (c).
NOTE
The two guide pin (b) in the distributing ring have to
be fitted properly in the hole (c).
Check the distance “A”. If the play is larger than 2 mm
the guide pins have not entered the hole properly.
G0378031
a. Drill mark
b.
Guide pin
c.
Guide pin
6.
Screw cap nut (22) counter-clockwise onto the
spindle. Tighten firmly.
Left-hand thread!
G0378111
7.
Fit sliding bowl bottom (21). Make sure that
the square seal ring lies concentrically in its
groove. Press the sliding bowl bottom down on
the upper distributing ring.
G0072031
8.
Check point
Before assembling the bowl discs, check the
threads of the bowl hood and bowl body, see
5.3.8 Threads on bowl hood and bowl body on
page 46
.
93
www.fdm.com.pe
Содержание P 605
Страница 8: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 www fdm com pe...
Страница 18: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 2 Safety instructions www fdm com pe...
Страница 77: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 6 Dismantling Assembly www fdm com pe...