
[email protected]
whatsapp:959440045
4
Separator basics
4.1
Design and function
Bowl opening
The key event to start a sludge discharge is the
downward movement of the operating slide.
This is accomplished by supply of opening
water (372) to the discharge mechanism. Water
is drained off through nozzles (Y) in the bowl
body. The sliding bowl bottom is rapidly pressed
downwards by the force from the liquid in the
bowl, opening the sludge ports.
Bowl closing
After the sludge is discharged the sliding bowl
bottom is immediately pressed up and the
sludge ports in the bowl wall are closed.
G0112521
Supply of opening water and closing water
372.Opening water
B. Closing and make-up water through bowl spindle
Y. Nozzles
27
www.fdm.com.pe
Содержание P 605
Страница 8: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 www fdm com pe...
Страница 18: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 2 Safety instructions www fdm com pe...
Страница 77: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 6 Dismantling Assembly www fdm com pe...