
[email protected]
whatsapp:959440045
6
Dismantling & Assembly
6.2
Bowl spindle and frame
8.
Assemble, in the following sequence:
-
Rubber buffer (10)
-
Buffer holder (9)
-
Fan (8)
-
Gasket (7)
-
Top bearing cover (6)
Make sure that the Ø 3 mm hole in fan (8) is
clean and the lugs in the fan enter the recesses
in the bowl spindle.
Before tightening, make sure that there is some
play (a) between top bearing cover (6) and the
frame. The play will disappear when the screws
are tightened.
Tighten the screws sequentially (not crosswise)
in order to successively compress the rubber
buffers.
G0114421
9.
Push down deflector ring (5) till it stops.
G0114541
A. Silicone grease (thin layer)
111
www.fdm.com.pe
Содержание P 605
Страница 8: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 www fdm com pe...
Страница 18: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 2 Safety instructions www fdm com pe...
Страница 77: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 6 Dismantling Assembly www fdm com pe...