
[email protected]
whatsapp:959440045
8
Operating
8.3
Purifier Operation
8.3
Purifier Operation
8.3.1
Operating water interface
Alfa Laval ref. 565819 Rev. 0
Proposed operation of operating water interface
for purifier execution.
Closing the bowl and supplying liquid seal:
1.
Initialise by opening connection 372 for 1
second.
2.
Close the bowl by opening connection 373 for
40 seconds.
3.
Supply liquid seal by opening connection 206
for 12 seconds.
4.
Open the feed (connection 201).
Starting sequence illustrated graphically:
g0931751
Performing a discharge:
1.
Close the feed (connection 201).
2.
Open connection 373 and perform a
displacement (of the interface) by opening
connection 206.
3.
After 8 seconds open connection 372 during 1
second.
4.
After another 12 seconds close connections
206 and 373.
5.
Open the feed (connection 201).
Starting sequence illustrated graphically:
g0931761
169
www.fdm.com.pe
Содержание P 605
Страница 8: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 www fdm com pe...
Страница 18: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 2 Safety instructions www fdm com pe...
Страница 77: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 6 Dismantling Assembly www fdm com pe...