
[email protected]
whatsapp:959440045
5
Service instructions
5.1
Periodic maintenance
5.1.3
Maintenance procedure
At each intermediate and major service, take a
copy of the service log and use it for notations
during the service. An intermediate and major
service should be carried out in the following
manner:
1.
Dismantle the parts as mentioned in the service
log and described in
6 Dismantling & Assembly
on page 75
. Place the separator parts on clean,
soft surfaces such as pallets.
2.
Inspect and clean the dismantled separator
parts according to the service log.
3.
Fit all the parts delivered in the service kit
while assembling the separator as described
in
6 Dismantling & Assembly on page 75
. The
assembly instructions have references to check
points which should be carried out during the
assembly.
5.1.4
Service kits
Special service kits are available for Intermediate
Service (IS), Major Service (MS) and 3-year
service (3-YSK).
For other services the spare parts have to be
ordered separately.
Note that the parts for IS are not included in the
MS kit.
The contents of the service kits are described
in the Spare Parts Catalogue.
NOTE
Always use Alfa Laval genuine parts as otherwise the
warranty will become invalid. Alfa Laval takes no
responsibility for the safe operation of the equipment
if non-genuine spare parts are used.
Spare parts kits are available for Intermediate
Service and Major Service
33
www.fdm.com.pe
Содержание P 605
Страница 8: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 www fdm com pe...
Страница 18: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 2 Safety instructions www fdm com pe...
Страница 77: ...ventas fdm com pe fdmsac gmail com whatsapp 959440045 6 Dismantling Assembly www fdm com pe...