Operation
multi EA 4000
82
The gas sluice is correctly assembled if the gap be-
tween the pressure ring and the matching piece is
evenly approx. 1 mm wide.
5.
Fit the coupling element with three hexagon socket screws
to the right side of the basic device. Make sure that the
guide hole is above the slot in the basic device and the re-
cess points towards the front.
6.
Remove the heat guard. To do so, release 2 slotted screws
with a screwdriver.
7.
Slide the quartz tube with gas sluice up to the stop into the
combustion furnace. In the process insert the guide pins
into the guide hole (see dotted line).
1 Oxygen connection
2 Argon connection
When not using the flame sensor:
8.
Push the hose for the oxygen supply (hose no. 17) onto
the glass tube of the combustion tube (1).
9.
Connect the hose for the argon supply to the gas sluice (2).
NOTICE! The hoses must not be kinked or twisted.
The quartz tube is inserted in the multi EA 4000.
Содержание Analytik Jena multi EA 4000
Страница 1: ...Operating Manual multi EA 4000 Elementary analyzer C S and Cl solids analysis...
Страница 50: ...Commissioning multi EA 4000 50 Figure 32 multi EA 4000 C S Hose diagram...
Страница 52: ...Commissioning multi EA 4000 52 Figure 33 multi EA 4000 Cl Hose diagram...
Страница 54: ...Commissioning multi EA 4000 54 Figure 34 multi EA C S Cl for C S measurements Hose diagrams...
Страница 55: ...multi EA 4000 Commissioning 55 Figure 35 multi EA 4000 C S Cl for Cl measurements...
Страница 57: ...multi EA 4000 Commissioning 57 Figure 36 Automatic TIC solids module Hose diagrams...
Страница 58: ...Commissioning multi EA 4000 58 Figure 37 multi EA 4000 C S with automatic TIC solids module...
Страница 60: ...Commissioning multi EA 4000 60 Figure 38 multi EA 4000 with man TIC solids module Hose diagrams...
Страница 61: ...multi EA 4000 Commissioning 61 Figure 39 multi EA 4000 C S Cl with man TIC solids module...