multi EA 4000
Commissioning
53
5.3.3
Positioning the multi EA 4000 C/S Cl
For the combination multi EA 4000 - C/S module - Cl module, the following connec-
tions must be in place:
multi EA 4000 connections
Target
"analyte out"
C/S module "analyte"
"O
2
"
Oxygen gas connection
Mains cable
Mains connection
"com1"
C/S module "COM"
"pump in"
C/S module "pump"
"Ar"
Gas connection for argon (only required for Cl
measurement and pyrolysis)
"waste out"
Open outlet for the exhaust air of the analyzer
Additional C/S module con-
nections
Target
"PC"
USB port for connection to the computer
"Cl-Coul"
Cl module "Cl-Coul"
"scale"
External scales (optional)
"sampler"
Connection of the autosampler FPG 48
Socket for mains plug
Mains connection
Additional Cl module connec-
tions
Target
"Cl"
C/S module "Cl"
Socket for mains plug
Mains connection
The following hose diagram (Figure 34) also applies for the optional determination of
carbon after pyrolysis. For the pyrolysis measurement, attach an additional extraction
pipe close to the furnace inlet.
Connections
Содержание Analytik Jena multi EA 4000
Страница 1: ...Operating Manual multi EA 4000 Elementary analyzer C S and Cl solids analysis...
Страница 50: ...Commissioning multi EA 4000 50 Figure 32 multi EA 4000 C S Hose diagram...
Страница 52: ...Commissioning multi EA 4000 52 Figure 33 multi EA 4000 Cl Hose diagram...
Страница 54: ...Commissioning multi EA 4000 54 Figure 34 multi EA C S Cl for C S measurements Hose diagrams...
Страница 55: ...multi EA 4000 Commissioning 55 Figure 35 multi EA 4000 C S Cl for Cl measurements...
Страница 57: ...multi EA 4000 Commissioning 57 Figure 36 Automatic TIC solids module Hose diagrams...
Страница 58: ...Commissioning multi EA 4000 58 Figure 37 multi EA 4000 C S with automatic TIC solids module...
Страница 60: ...Commissioning multi EA 4000 60 Figure 38 multi EA 4000 with man TIC solids module Hose diagrams...
Страница 61: ...multi EA 4000 Commissioning 61 Figure 39 multi EA 4000 C S Cl with man TIC solids module...