multi EA 4000
Commissioning
59
5.3.5
Positioning the manual TIC solids module
For the combination multi EA 4000 - C/S module - TIC solids module, the following
connections must be in place:
multi EA 4000 connections
Target
"analyte out"
Open
"O
2
"
Oxygen gas connection
Mains cable
Mains connection
"com1"
C/S module "COM"
"pump in"
Open
"Ar"
Argon gas connection
"waste out"
Open outlet for the exhaust air of the analyzer
C/S module connections
Target
"PC"
USB port for connection to the computer
"scale"
External scales (optional)
"pump"
Open
Socket for mains plug
Mains connection
"analyte" connection
TIC module "analyte"
Additional TIC module con-
nections
"O
2
"
Oxygen gas connection with quick-release coupling
Set oxygen inlet pressure to 200 to 400 kPa
(29 - 58 psi)
Socket for mains plug
Mains connection
Connections
Содержание Analytik Jena multi EA 4000
Страница 1: ...Operating Manual multi EA 4000 Elementary analyzer C S and Cl solids analysis...
Страница 50: ...Commissioning multi EA 4000 50 Figure 32 multi EA 4000 C S Hose diagram...
Страница 52: ...Commissioning multi EA 4000 52 Figure 33 multi EA 4000 Cl Hose diagram...
Страница 54: ...Commissioning multi EA 4000 54 Figure 34 multi EA C S Cl for C S measurements Hose diagrams...
Страница 55: ...multi EA 4000 Commissioning 55 Figure 35 multi EA 4000 C S Cl for Cl measurements...
Страница 57: ...multi EA 4000 Commissioning 57 Figure 36 Automatic TIC solids module Hose diagrams...
Страница 58: ...Commissioning multi EA 4000 58 Figure 37 multi EA 4000 C S with automatic TIC solids module...
Страница 60: ...Commissioning multi EA 4000 60 Figure 38 multi EA 4000 with man TIC solids module Hose diagrams...
Страница 61: ...multi EA 4000 Commissioning 61 Figure 39 multi EA 4000 C S Cl with man TIC solids module...