Removing the Top Cover
Figure 7-12:
A.
Top cover
B.
M5 x 12 mm button head socket screws (4)
C.
Chassis assembly
D.
M5 flat washers (4)
Procedure
1.
Set the
ON/OFF
switches on the front and back panel to OFF.
2.
Allow the analyzer to cool for at least two hours. Allow it to cool for twelve hours if
replacing the analysis cell.
3.
Disconnect all external cables.
Tag if necessary.
4.
Remove the analyzer from the rack and place on a flat, stable surface that can
accommodate the weight. This step requires two people to lift and transport the
analyzer.
Troubleshooting and diagnostics
Installation, Operations, and Maintenance Manual
71
Содержание Rosemount CT5400
Страница 15: ...Abbreviation Description WEEE Waste electrical and electronic equipment μm Micro meter ...
Страница 16: ......
Страница 20: ...Contents iv Rosemount CT5400 ...
Страница 32: ...Plan 12 Rosemount CT5400 ...
Страница 40: ...Install 20 Rosemount CT5400 ...
Страница 44: ...Startup procedure 24 Rosemount CT5400 ...
Страница 54: ...Operating the analyzer 34 Rosemount CT5400 ...
Страница 158: ...Troubleshooting and diagnostics 138 Rosemount CT5400 ...
Страница 164: ...Shutdown procedure 144 Rosemount CT5400 ...
Страница 166: ...Preventative maintenance 146 Rosemount CT5400 ...
Страница 172: ...Engineering Drawings 152 Rosemount CT5400 ...