Power Socket Fuses
Figure 7-17:
A. Fuse holder
B. Fuse
C. Cover
4.
Pull out the fuse holder (A).
5.
Remove the fuse (B) from the holder (A) .
6.
Fit a new fuse (B), type: 240 V, 50 Hz, 500 mA, fast-acting, into the fuse holder (A).
7.
Fully push in the fuse holder (A).
8.
Close the fuse cover (C).
9.
Reconnect the external power supply to the power socket.
10.
Start up the analyzer by turning the
ON/OFF
switches to the
ON
position.
7.12
Replacing the internal fuses
The analyzer contains a number of internal fuses. The same procedure is used to replace all
of the internal fuses; therefore, the replacement of only one is described.
Troubleshooting and diagnostics
82
Rosemount CT5400
Содержание Rosemount CT5400
Страница 15: ...Abbreviation Description WEEE Waste electrical and electronic equipment μm Micro meter ...
Страница 16: ......
Страница 20: ...Contents iv Rosemount CT5400 ...
Страница 32: ...Plan 12 Rosemount CT5400 ...
Страница 40: ...Install 20 Rosemount CT5400 ...
Страница 44: ...Startup procedure 24 Rosemount CT5400 ...
Страница 54: ...Operating the analyzer 34 Rosemount CT5400 ...
Страница 158: ...Troubleshooting and diagnostics 138 Rosemount CT5400 ...
Страница 164: ...Shutdown procedure 144 Rosemount CT5400 ...
Страница 166: ...Preventative maintenance 146 Rosemount CT5400 ...
Страница 172: ...Engineering Drawings 152 Rosemount CT5400 ...