8
Shutdown procedure
8.1
Shutdown procedure safety precautions
This chapter describes the analyzer's shutdown procedure.
CAUTION!
EQUIPMENT DAMAGE
Always follow this shutdown procedure. Damage to the analyzer may result from a failure to
follow this procedure.
The analyzer normally operates continuously. It should only be necessary to shut down the
instrument in the following circumstances:
•
In order to perform repairs or maintenance on the analyzer
•
When the analyzer has to be switched off as part of a plant shutdown or plant
maintenance
Use the display controller to perform the shutdown procedure.
Operation of the analyzer is controlled through the display controller located on the front
panel of the instrument.
Chapter 4
of this manual describes how to use the display
controller.
NOTICE
The gas concentrations shown in the following screenshots may be different from those shown
in your particular analyzer. The screenshots indicate the functionality of the software, which is
the same regardless of the gases or gas concentrations being measured.
WARNING!
BURNS
Do not touch any part of the analyzer. Assume all parts of the analyzer are hot unless it has
been switched off and allowed to cool down. Some parts of the analyzer may be heated to
190 °C (374 °F). Always wear proper protective equipment when handling the analyzer.
•
Switch off the analyzer and allow it to cool for at least two hours before fitting,
removing, or performing any maintenance.
•
The analysis cell is insulated against heat loss. Allow the analyzer to cool for at least
twelve hours before performing any maintenance on, or in the vicinity of, the analysis
cell.
Failure to allow sufficient cooling may cause serious burn injury to personnel. If burns occur,
seek immediate medical treatment.
Shutdown procedure
Installation, Operations, and Maintenance Manual
139
Содержание Rosemount CT5400
Страница 15: ...Abbreviation Description WEEE Waste electrical and electronic equipment μm Micro meter ...
Страница 16: ......
Страница 20: ...Contents iv Rosemount CT5400 ...
Страница 32: ...Plan 12 Rosemount CT5400 ...
Страница 40: ...Install 20 Rosemount CT5400 ...
Страница 44: ...Startup procedure 24 Rosemount CT5400 ...
Страница 54: ...Operating the analyzer 34 Rosemount CT5400 ...
Страница 158: ...Troubleshooting and diagnostics 138 Rosemount CT5400 ...
Страница 164: ...Shutdown procedure 144 Rosemount CT5400 ...
Страница 166: ...Preventative maintenance 146 Rosemount CT5400 ...
Страница 172: ...Engineering Drawings 152 Rosemount CT5400 ...