The
Main menu
is used to access the software routines and screens that are used for
calibration and maintenance. Five options are presented (
Figure 6-1
). For more information
about the options on the
Main menu
, see
Section 4.9
.
On the
Main menu
,
and
can be used to scroll between the menu options (A). When
the option you want is highlighted (
GAS SERVICE
is the example shown in
Figure 6-1
), press
to go to the first screen of that software routine.
6.3
Calibration
Calibration flows the known cylinder gas through the analyzer and then adjusts the
readout until the measurement matches the cylinder. This adjustment is then applied to all
measurements until the next calibration. There are two circumstances in which you may
want to calibrate.
1.
After you verify (see
Chapter 5
) and find that the analyzer readings are outside of
tolerance
2.
At regular intervals, such as once a day or once a shift
6.3.1
Zero calibration
Zero calibration is calibrating the analyzer so that when no sample gas is flowing through
it, the gas concentrations measured by the instrument are zero. Zero calibration is done by
calibrating the analyzer measurements against a known sample gas using the following
procedure:
Prerequisites
Run the analyzer at a stable temperature for at least thirty minutes prior to commencing
this procedure.
Use nitrogen gas of
instrument gas
purity as the zero calibration gas.
Procedure
1.
Make sure that a pressure regulator is connected to the nitrogen gas bottle.
2.
Connect a hose from the nitrogen gas bottle through a T-piece to the sample supply
port on the rear of the analyzer. Connect an excess flow line to the unused port on
the T-piece and route the excess flow line to a suitable extractor.
3.
On the display controller of the analyzer, browse to the Main menu as described in
Section 4.9
.
Gas Calibration Procedures
46
Rosemount CT5400
Содержание Rosemount CT5400
Страница 15: ...Abbreviation Description WEEE Waste electrical and electronic equipment μm Micro meter ...
Страница 16: ......
Страница 20: ...Contents iv Rosemount CT5400 ...
Страница 32: ...Plan 12 Rosemount CT5400 ...
Страница 40: ...Install 20 Rosemount CT5400 ...
Страница 44: ...Startup procedure 24 Rosemount CT5400 ...
Страница 54: ...Operating the analyzer 34 Rosemount CT5400 ...
Страница 158: ...Troubleshooting and diagnostics 138 Rosemount CT5400 ...
Страница 164: ...Shutdown procedure 144 Rosemount CT5400 ...
Страница 166: ...Preventative maintenance 146 Rosemount CT5400 ...
Страница 172: ...Engineering Drawings 152 Rosemount CT5400 ...