Refer to
Figure 7-13
and proceed as follows:
Removing the Bottom Cover
Figure 7-13:
A.
Bottom cover
B.
M5 x 12 mm button head socket screws (4)
C.
M5 flat washers (4)
Procedure
1.
Set the
ON/OFF
switches on the front and back panel to OFF.
2.
Allow the analyzer to cool for at least two hours. Allow to cool for twelve hours if
replacing the analysis cell.
3.
Disconnect all external cables.
Tag if necessary
4.
Remove the analyzer from the rack and place it upside down on a flat, stable surface
that can accommodate the weight. This step requires two people to lift and
transport the analyzer.
5.
Remove and retain the four button head socket screws and associated flat washers.
6.
Lift the cover vertically, clear of the chassis assembly. Set it aside, out of the working
area.
7.
Examine the cover for signs of physical damage. If it is undamaged, retain and
reinstall when all repairs are complete. Minor paintwork may be re-touched.
7.9
Replacing the LCD display
To replace the display, complete the following instructions.
Troubleshooting and diagnostics
Installation, Operations, and Maintenance Manual
73
Содержание Rosemount CT5400
Страница 15: ...Abbreviation Description WEEE Waste electrical and electronic equipment μm Micro meter ...
Страница 16: ......
Страница 20: ...Contents iv Rosemount CT5400 ...
Страница 32: ...Plan 12 Rosemount CT5400 ...
Страница 40: ...Install 20 Rosemount CT5400 ...
Страница 44: ...Startup procedure 24 Rosemount CT5400 ...
Страница 54: ...Operating the analyzer 34 Rosemount CT5400 ...
Страница 158: ...Troubleshooting and diagnostics 138 Rosemount CT5400 ...
Страница 164: ...Shutdown procedure 144 Rosemount CT5400 ...
Страница 166: ...Preventative maintenance 146 Rosemount CT5400 ...
Страница 172: ...Engineering Drawings 152 Rosemount CT5400 ...