UPServer2.0
ON-LINE DOUBLE CONVERSION
UPS initial startup
To start up the UPS:
NOTE
Verify that the total equipment ratings do not exceed the UPS capacity to prevent
an
Overload alarm
1. If optional EBPs are installed, verify that the EBPs are connected to the UPS.
2. Plug the equipment to be protected into the UPS, but do not turn on the
protected equipment.
3. Make any necessary provisions for cord retention and strain relief.
4. Plug the detachable UPS power cord into the input connector on the UPS
rear cover.
5. Plug the UPS power cord into a power outlet. The UPS front cover display
illuminates.
6. The UPS will do self-test when power on. After that, the charger will
charge the battery. If the output displayed on LCD is “0”, there is no
output. If you need the UPS output the utility without starting the UPS when
plug into the utility,you need to set bPS option to “ON” on the setting
mode,refer to Page 38.
7. Press the combination start up buttons on the UPS front cover for at least
half a second. The UPS will start up and the LED will turn on and off
sequentially.
8. Check the UPS front cover display for active alarms or notices. Resolve any
active alarms before continuing. See Troubleshooting”. If the
indicator
is on, do not proceed until all alarms are clear.Check the UPS status from
the front cover to view the active alarms. Correct the alarms and restart if
necessary.
10. Verify that the
indicator illuminates solid, indicating that the UPS is
operating normally and any loads are powered.
11. If optional EBPs are installed, see “Configuring Battery settings” on page
41 to set the number of installed EBPs.
12. To change any other factory-set defaults, see “User settings”
NOTE
:
At initial startup, the UPS sets system frequency according to input line
frequency (input frequency auto-sensing is enabled by default).
NOTE
:
At initial startup,please set the output voltage needed before start up the
UPS,After the subsequent startup,the UPS will output the setting voltage.
13
.
If you installed an optional EPO, test the EPO function: Activate the external
EPO switch. Verify the status change on the UPS display. Deactivate the
external EPO switch and restart the UPS.
NOTE
:
The internal batteries charge to 80% capacity in less than 5 hours. However,
we recommend that the batteries should be charged for 48 hours after
installation or long-term storage. If optional EBPs are installed, see the
recharge times listed in Table 21.