![Elsist UPserver 2.0 series Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/elsist/upserver-2-0-series/upserver-2-0-series_user-manual_2396510013.webp)
UPServer2.0
ON-LINE DOUBLE CONVERSION
CAUTION
A small amount of arcing may occur when connecting an EBP to the UPS. This is normal
and will not harm personnel. Insert the EBP cable into the UPS battery connector quickly
and firmly.
5.
Plug the EBP cable(s) into the battery connector(s) as shown in Figure 13. Up to four
EBPS may be connected to the UPS.
Connect black to black,. Press the connector tightly
together to ensure a proper connection.
To connect a second EBP, unclip the EBP connector on the first EBP and pull gently to
extend the wiring to the EBP connector on the second EBP. Repeat for any additional
EBPS.
6.
Verify that the EBP connections are tight and the adequate bend radius and strain relief
exist for each cable.
Figure12 Typical EBP Installation
7.
Replace the EBP front cover.
To replace the cover, verify that the EBP cables are routed through the EBP cover knockouts, cover
connects with the cover hook near the left side of the EBP cabinet. Repeat for each additional EBP.
It is the same with the installation of the front cover. (Refer” to UPS installation”)
8.
Verify that all wires connected between the UPS and EBP(s) are installed behind the front covers
and not accessible to users.
9.
Return to Step 4 to continue the UPS installation.
Rackmount converted to Tower
Installation
1
.
Rackmount converted to Tower plastic base installation
①
two plastic base brackets
②
flatten it after intercrossing
intercross as following Figure