34
HV-Grundlast
3. MAKEREADY
3.13 CONTACT MONITORING
On the usage of the device in automatic systems, in many cases it is
necessary to check the contact to the test object. One possible method
of performing this check can be to monitor the current flowing through the
test object with the high voltage applied.
For this purpose a base load is connected in parallel with the test object;
if the current flowing does not reach a specific minimum value Imin, the
connection is faulty. The magnitude of the current flowing can be monitored
and evaluated via the interface using the Imin value.
The circuit diagram below (Fig. 3.18) shows the principle of the monitoring
of the minimum current.
HV-base load
Fig. 3.17: Contact monitoring
Combi-tester G7-1G/-1H/-1T/-1U
Содержание G7-1G
Страница 5: ...5 1 INTRODUCTION free page Combi tester G7 1G 1H 1T 1U...
Страница 38: ...38 4 Operating modes 4 2 Normal Mode Test sequence Combi tester G7 1G 1H 1T 1U...
Страница 39: ...39 4 Operating modes 4 2 1 HV IS test normal mode Combi tester G7 1G 1H 1T 1U...
Страница 40: ...40 4 Operating modes 4 2 2 PE test normal mode Combi tester G7 1G 1H 1T 1U...
Страница 41: ...41 4 Operating modes 4 2 3 Normal mode input step Combi tester G7 1G 1H 1T 1U...
Страница 42: ...42 4 Operating modes 4 2 4 Normal mode output step Combi tester G7 1G 1H 1T 1U...
Страница 43: ...43 4 Operating modes 4 2 4 Normal mode time step Combi tester G7 1G 1H 1T 1U...
Страница 44: ...44 4 Operating modes 4 3 Fast Start Mode test sequence Combi tester G7 1G 1H 1T 1U...
Страница 45: ...45 4 Operating modes 4 3 1 Fast Start Mode PE HV ISO Test Combi tester G7 1G 1H 1T 1U...