78
10. Menu System
load
- a list of all defined test plans. Mark and load a test plan of the list.
See also Chapt. 10.5.1. It is possible:
- to create a test plan by chose one or more parameter sets,
- to edit and save test plans,
- to start an automatic test sequence by selecting and start one of
the test plans.
edit
- opens a list of all defined test plans. Mark and edit a test plan of the
list. Edit and save actual the test plan
create
- an existing test plan can be saved with an new name. Edit the
test plan for the new requirements. The creation of an new empty test
plan is also possible.
delate -
opens a list of all defined test plans. Mark a test plan for delete
and confirm it.
Note: Create test plans with " meaningful" names.
load
edit
create
delete
Combi-tester G7-1G/-1H/-1T/-1U
Содержание G7-1G
Страница 5: ...5 1 INTRODUCTION free page Combi tester G7 1G 1H 1T 1U...
Страница 38: ...38 4 Operating modes 4 2 Normal Mode Test sequence Combi tester G7 1G 1H 1T 1U...
Страница 39: ...39 4 Operating modes 4 2 1 HV IS test normal mode Combi tester G7 1G 1H 1T 1U...
Страница 40: ...40 4 Operating modes 4 2 2 PE test normal mode Combi tester G7 1G 1H 1T 1U...
Страница 41: ...41 4 Operating modes 4 2 3 Normal mode input step Combi tester G7 1G 1H 1T 1U...
Страница 42: ...42 4 Operating modes 4 2 4 Normal mode output step Combi tester G7 1G 1H 1T 1U...
Страница 43: ...43 4 Operating modes 4 2 4 Normal mode time step Combi tester G7 1G 1H 1T 1U...
Страница 44: ...44 4 Operating modes 4 3 Fast Start Mode test sequence Combi tester G7 1G 1H 1T 1U...
Страница 45: ...45 4 Operating modes 4 3 1 Fast Start Mode PE HV ISO Test Combi tester G7 1G 1H 1T 1U...