
17
Compass
Installation Manual
COMPASS INSTALLATION MANUAL
www.eaton.com/compass
Order of Installation
1. Prepare the staging and installation areas.
2. Unpack components and component kits. Verify
inventory.
3. Install legs, stretchers, and modesty panels.
4. Install organizer uprights, alignment connectors
and organizer panels.
5. Install overhead shelves, compartments, and
doors.
6. Install worksurfaces, tie plates, and transaction
shelves.
7. Level and align installed components.
8. Install data and electrical cabling.
9. Install drawers, accessories, and lighting.
10. Install wire way covers and top caps.
Best Practices
•
Work in teams of two or more people to install
Compass components.
•
Compare the installation plan with the bill of
materials to make sure all the required components
are present.
•
Do not attempt to install more than one workspace
at a time. Stagger large installations to facilitate
leveling and alignment.
•
When connecting multiple components, assign one
leg as the “anchor” and work outward from that
location.
•
To maintain structural integrity do not use transition
legs at the end of unsupported worksurfaces.
WARNING
Components can become unstable during assembly.
Use caution when installing overhead compartments
and shelves.