12
Phone:(910) 392
‐
2490
416 Landmark Drive
www.easterninstruments.com
GROUNDING THE CENTRIFEEDER
A separate Earth Ground Wire (14 gauge) is required to be connected to the meter module. This
ground wire is required for operator safety and for proper opera on. This ground must be sup
‐
plied from the main plant ground at the service entrance.
PLEASE BE SURE TO GROUND THE CENTRIFEEDER METER MODULE TO AN EARTH GROUND!