- 31 -
Capacity Hat Assembly
1. Locate the eight wires for the capacity hat. Four wires are 39 feet in length. Four wires are 24
feet in length. Ring Terminals are installed on the ends of the wires.
2. Gather the other parts required for the Capacity Hat assembly.
3. If not already done, insert the fiberglass tube into the aluminum tube making sure the drilled
holes are aligned.