- 25 -
10. Locate two
DXE-ECL-1500
Stainless Steel Element Clamps, one
DXE-ECL-1250
Stainless
Steel Element Clamp and the 1.25" OD x 72" element tube that was marked in step 7.
Slide the two
DXE-ECL-1500
element clamps over the 1.5" OD element tube. Slide the one
DXE-ECL-1250
element clamp over the 1.25" OD element tube. Slide the 1.25" OD element
tube inside the 1.5" OD element tube to the mark made at 4". Tighten the two
DXE-ECL-1500
clamps in place. Do not over-tighten which may cause clamp damage. This tubing joint uses a
second clamp to ensure proper element position. Slide the
DXE-ECL-1250
next to the joint
between the 1.5" OD element tube and 1.25" OD element tube. Tighten the clamp in place. This
third clamp ensures that the 1.25" section cannot slip further inside the 1.5" OD section.
11. Locate the
DXE-ECL-1250
Stainless Steel Element Clamp and the 1.125" OD x 72" element
tube that was marked in step 7. Slide the
DXE-ECL-1250
element clamp over the 1.125" OD
element tube. Slide the 1.125" OD element inside the 1.25" OD element tube to the mark made
at 4". Tighten the
DXE-ECL-1250
clamp in place. Do not over-tighten which may cause clamp
damage.
12. Locate the
DXE-ECL-1250
Stainless Steel Element Clamp, the 1" OD x 72" element tube that
was marked in step 7. Slide the
DXE-ECL-1250
element clamp over the 1.125" OD element
tube. Slide the 1" OD element inside the 1.125" OD element to the mark made at 12”. Tighten
the
DXE-ECL-1250
clamp in place. Do not over-tighten which may cause clamp damage.
13. The Capacity Hat assembly will be mounted on the 1” OD element tube in a later step.