
PROPRIETARY AND CONFIDENTIAL DRAFT 5 Feb 04
4 - 3
11. Install, but do
not
tighten, the two #10-32 x 3/8" Nylok
screws (H) in the upper holes on the inside of the upper
post (D).
12. Slowly lower the warmer (I) onto the upper post (D).
Align the slots (J) of the warmer under the two #10-32
x 3/8" Nylok screws (H) in the upper holes on the
inside of the upper post.
13. Install the four #10-32 x 3/8" Nylok screws
(K)
to
secure the pivot bracket to the head support plate (C).
14. Tighten the two #10-32 x 3/8" Nylok screws (H)
installed in step 11 to secure the warmer (I) to the
upper post (D).
15. Remove and
discard
the two #10-32 x 3/8" Nylok
screws (K) from the lower corners of the head support
plate.
16. Thread the power cable (L) out through the opening in
the front of the upper post.
17. At the controller (B), connect the power cable to
connector J4 on the power and control P.C. board
assembly.
18. Mount the controller (B) on the upper post.
19. Install the two #8-32 x ¾" screws (M) that secure the
controller to the head support plate (C).
20. Remove and
discard
the two #10-32 x 3/8" Nylok
screws (N).
H
D
I
J
K
C
L
B
B
M
C
N
Содержание RW82
Страница 2: ...This page intentionally left blank ...
Страница 4: ...This page intentionally left blank ...
Страница 16: ...PROPRIETARY AND CONFIDENTIAL DRAFT 5 Feb 04 1 8 This page intentionally left blank ...
Страница 118: ...PROPRIETARY AND CONFIDENTIAL DRAFT 5 Feb 04 6 10 Pneumatic System Pneumatic System Block Diagram ...
Страница 124: ...PROPRIETARY AND CONFIDENTIAL DRAFT 5 Feb 04 7 4 This page intentionally left blank ...
Страница 125: ...This page intentionally left blank ...