Getting Started
Unpacking & Setup
NOTE: Due to the weight of the APM-HDC-5400, it is recommended
that two people lift it from the shipping case.
1. Remove all loose components from the machine area in the
shipping case.
2. Remove the plastic bag from around the Overarm to provide
access to the Overarm.
3. Use the Overarm as a lifting handle by grabbing as close to the
Overarm pivot point as possible.
a. Lift the machine straight up while firmly holding the case
down on the outside edges. If the machine is lifted at an
angle, it will cause binding in the case.
b. Gently place the machine on a suitable, stable
work surface.
4. Remove remaining plastic wrapping from machine and
touchscreen panel.
5. Inspect the machine for any damage that may have occurred
in shipping.
6. Remove the
BLUE
Koby Air Filter from the shipping case.
Remove plastic cap from air supply fitting on the back of the
machine. Connect plastic airline provided by pushing line firmly
into fitting. Connect other end of airline to
BLACK
capped end of
Koby Air Filter.
7. Using the proper air supply fittings, connect the
RED
capped end
of Koby Air Filter into your compressed air system. The inlet of
the Koby Air Filter is ¼” NPT pipe thread. The compressed air
requirements are: 90-120 pounds per square inch (6.2- 8.5 bar),
clean, dry, oil-free air.
8. Connect Drain Hose provided to Drain Hose Fitting on back of
machine. Route Drain Hose to a collection container below
the bench.
9. In order to raise and lower the Overarm, you must release
the Overarm locking mechanism. Press the illuminated Overarm
Quick-Release button located at the front of the Loadcell Housing
and lift up.
3