ASE 100 Operator’s Manual
3-22
Doc. 031842-01 5/02
Always install the cell in the cell holder. If you install the cell
directly in the oven, the cell door will not close and the run will
not start.
While holding the
extraction cell at a
slight angle, position
the bottom end cap
under the bottom
latch of the cell
holder.
Raise the cell so that
the bottom end cap
lifts the bottom latch.
Straighten the cell
until it is vertical.
Now, lower the cell
until the top end cap
rests on the top latch
of the cell holder.
Содержание ASE 100
Страница 8: ...ASE 100 Accelerated Solvent Extractor vi Doc 031842 01 5 02...
Страница 24: ...ASE 100 Operator s Manual 2 10 Doc 031842 01 5 02 Figure 2 4 ASE 100 Rear Panel...
Страница 32: ...ASE 100 Operator s Manual 2 18 Doc 031842 01 5 02...
Страница 42: ...ASE 100 Operator s Manual 3 10 Doc 031842 01 5 02 Figure 3 2 Inspecting Cell O Rings...
Страница 60: ...ASE 100 Operator s Manual 3 28 Doc 031842 01 5 02...
Страница 69: ...4 Troubleshooting Doc 031842 01 5 02 4 9 Figure 4 1 ASE 100 Plumbing Diagram...
Страница 106: ...ASE 100 Operator s Manual 5 36 Doc 031842 01 5 02...
Страница 110: ...ASE 100 Operator s Manual A 4 Doc 031842 01 5 02...
Страница 113: ...B Installation Doc 031842 01 5 02 B 3 Figure B 1 ASE 100 Rear Panel...
Страница 150: ...ASE 100 Accelerated Solvent Extractor Index 8 Doc 031842 01 5 02...