ASE 100 Operator’s Manual
3-20
Doc. 031842-01 5/02
3.4
Running an Extraction
1. Press
MENU
to display the
MAIN
screen.
2. Select
SETUP
and press
ENTER
.
This displays the
SETUP
screen.
3. Check that the selected method is correct. If it is not, use an arrow to move the
cursor to
METHOD
, and then press
ENTER
to move the cursor to the editing
field. Press an arrow button to step through the method numbers and names.
When the method required for the extraction is displayed, press
ENTER.
This displays the
METHOD EDITOR
screen. If this is a custom method, check
that the parameters are appropriate for the extraction. Edit the method, if
necessary. (Remember to press
Enter
after making a change.)
Figure 3-9. Main Screen
Figure 3-10. Setup Screen (Initial view)
Содержание ASE 100
Страница 8: ...ASE 100 Accelerated Solvent Extractor vi Doc 031842 01 5 02...
Страница 24: ...ASE 100 Operator s Manual 2 10 Doc 031842 01 5 02 Figure 2 4 ASE 100 Rear Panel...
Страница 32: ...ASE 100 Operator s Manual 2 18 Doc 031842 01 5 02...
Страница 42: ...ASE 100 Operator s Manual 3 10 Doc 031842 01 5 02 Figure 3 2 Inspecting Cell O Rings...
Страница 60: ...ASE 100 Operator s Manual 3 28 Doc 031842 01 5 02...
Страница 69: ...4 Troubleshooting Doc 031842 01 5 02 4 9 Figure 4 1 ASE 100 Plumbing Diagram...
Страница 106: ...ASE 100 Operator s Manual 5 36 Doc 031842 01 5 02...
Страница 110: ...ASE 100 Operator s Manual A 4 Doc 031842 01 5 02...
Страница 113: ...B Installation Doc 031842 01 5 02 B 3 Figure B 1 ASE 100 Rear Panel...
Страница 150: ...ASE 100 Accelerated Solvent Extractor Index 8 Doc 031842 01 5 02...