Figure 23. Installing internal PERC riser
Next steps
1. Connect the cables to the backplane and then route the cables to the cable guiding latch and close the latch.
2.
3.
.
4. Install the
.
5. Place the system into the rack. For more information, see the
Rail Installation Guide
6.
7. Install the
.
8. Follow the procedure listed in
After working inside your system
Removing the HBA 330 from the internal PERC riser
Prerequisites
1. Follow the safety guidelines listed in
2. Power off the system and all attached peripherals.
3. Disconnect the system from the electrical outlet, and disconnect the peripherals.
4.
5. Remove the
6. Remove the system from the rack and place it on an ESD work bench. For more information, see the
Rail Installation Guide
at
7.
.
8.
9.
Remove the internal PERC riser
Steps
Pull the HBA 330 out of the connector on the internal PERC riser.