Figure 19. Installing air shroud
Next steps
1. If removed,
.
2. Install the
.
3. Place the system into the rack. For more information, see the
Rail Installation Guide
4.
5. Install the
.
6. Follow the procedure listed in
After working inside your system
Internal PERC riser
Removing the internal PERC riser
Prerequisites
1. Follow the safety guidelines listed in
2. Power off the system and all attached peripherals.
3. Disconnect the system from the electrical outlet, and disconnect the peripherals.
4.
5. Remove the
6. Remove the system from the rack and place it on an ESD work bench. For more information, see the
Rail Installation Guide
at
7.
.
8.
9. Open the cable guiding latch for easy access.
Steps
1. Lower the plunger and holding the blue touch points, lift the internal PERC riser out of the system.
Installing and removing system components
43