
Figure 122. Removing the right control panel
Next steps
Replace the right control panel
Installing the right control panel
Prerequisites
1. Follow the safety guidelines listed in
2. Power off the system and all attached peripherals.
3. Ensure that all internal cables are routed correctly and connected, and no tools or extra parts are left inside the system.
4.
5. Remove the
6. Remove the system from the rack and place it on an ESD work bench. For more information, see the
Rail Installation Guide
at
7.
.
8.
9.
.
Steps
1. Route the control panel cable through the right control panel cable clips and push the cable connector through the side of bay 2.
132
Installing and removing system components