defa.com
18
English
19
English
defa.com
9.2 CLU BASIC | ONLINE | CHARGE CONTROLLER | ENERGY METER (IN THE CHARGING STATION)
Installing an online CLU Basic with energy meters in the charging stations will require two
buses. Two separate 3-wire buses must be installed, but an 8-wire cable can be used for
both the buses. The wires between the USB interfaces and the bus cable must be joined
in a terminal block connector, preferably WAGO.
If a payment solution is provided, pay per minute the vehicle is connected, pay per
transaction and pay per kilowatt hour (kWh) is possible.
9.3 CLU BASIC | ONLINE | CHARGE CONTROLLER | ENERGY METER (IN THE DISTRIBUTION BOARD)
Installing an online CLU Basic with energy meters in the distribution board will require two
buses from the CLU:
1. A 3-wire bus connected in daisy chain between the energy meters.
2. A 3-wire bus connected to the “Control/RFID” connectors inside each charging
station.
The wires between the USB interface and the bus cable to the controller/RFID bus must
be joined in a terminal block connector, preferably WAGO.
If a payment solution is provided, pay per minute the vehicle is connected, pay per
transaction and pay per kilowatt hour (kWh) is possible.
LV
PS
5
V
DC OK
5VDC
230VAC
Energy meter
B
M
A
B
M
A
B
M
A
B
M
A
B
M
A
CONTROL/RFID
ENERGY METER
BUS
OUT
BUS
IN
CON
TROL/RFI
D
EN
ERGY
METE
R
CON
TROL/RFI
D
EN
ERGY
METE
R
LV
PS
5
V
DC OK
5VDC
230VAC