vPad-IV OPERATORS MANUAL
Example
A manufacturer's annual inspection procedure for an enteral feeding pump requires the device to be tested
at a rate of 125 ml/h. According to the manufacturer's procedure, the DUT is run for 15 minutes after
which the DUT output is then measured for 30 minutes. The DUT accuracy is specified as ±7%, however,
when tested with water the DUT will over-deliver by +4%. There is no requirement to determine the flow
during the startup phase.
The manufacturer's protocol is configured as shown in
Figure 26
and
Figure 27
. The
Set Rate
is 125
ml/h and the
Test Duration
is set to 15+30 = 45 minutes.
T
START
= 15 minutes is input via the menu of
Figure 27
. As shown in
Figure 26
, the pass/fail tolerance of the test is set to (-7+4) = -3% to (+7+4) =
+11%, per the manufacturer's specifications. Also as shown in
Figure 26
, the VTBI of the DUT will need
to be set to at least 93.75 ml to allow the test to be completed; in this example, setting the pump VTBI equal
to 200 ml would guarantee sufficient fluid is delivered.
Figure 27
Operation/Chapter 4
#
Page 35
Содержание vPad-IV
Страница 1: ...Operating Manual MN 138a vPad IV Modular Infusion Device Analyzer App Version 1 05 0 ...
Страница 2: ......
Страница 4: ......
Страница 8: ...Page iv ...
Страница 12: ...vPad IV OPERATORS MANUAL APPENDIX A SAMPLE TEST RECORD 79 Table of Contents Page viii ...
Страница 28: ...vPad IV OPERATORS MANUAL Overview Chapter 2 Page 12 ...
Страница 98: ...vPad IV OPERATORS MANUAL Appendix A Page 82 ...